Skip to main content

Technical Experience

Experience demonstrated, not declared.

BIM integration, systems coordination and information management in high-complexity projects. Technical evidence of what it means to work with SORA.

Each project documented in this section represents an intervention where information was the technical differentiator. Scopes, disciplines and solutions described reflect real work. Specific commercial details remain confidential.

Data Center · Mission Critical

Microsoft

BIM coordination of Special Systems for mission-critical infrastructure.

Data infrastructure expansion project with N+1 redundancy requirements and compliance with international availability standards. Multiple specialized contractors operating in parallel with full traceability requirements across all systems.

ISO 19650CDEAutodesk ACCNavisworksBEPIFC
Industrial · Precision Manufacturing

MANE

BIM information management for industrial plant with multiple interdependent disciplines.

Industrial manufacturing project with high density of MEP systems and special installations in technical spaces requiring continuous operation. Coordination between mechanical, electrical and process installations required constructible information before equipment arrived on site.

Revit MEPNavisworksISO 19650BIM Level 2
Healthcare · Active Hospital

Hospital Betania

BIM integration of critical systems in active hospital infrastructure.

Expansion and renovation project in a continuously operating hospital. The complexity of intervening in active hospital infrastructure demanded maximum-precision technical coordination: any undetected clash at the design stage had direct impact on clinical operations.

Revit MEPNavisworksCDEISO 19650
Healthcare Infrastructure · High-Complexity Project

PIAC

Special systems coordination for high-complexity healthcare infrastructure.

Healthcare infrastructure project with multiple special systems disciplines and continuous operation technical requirements. High installation density in technical spaces with strict dimensional constraints.

Revit MEPNavisworksISO 19650CDE
Retail · Regional Expansion

Dollar City

BIM standardization for regional retail expansion with multiple stores.

Retail expansion program with multiple store openings in different locations, requiring standardization of technical installation information to reduce coordination time and cost per store.

Revit MEPNavisworksBIM Level 1
Automation · Systems Integration Projects

NGT · Next Automation

BIM technical coordination for automation systems integration projects.

Industrial projects with high dependency on automation and control systems where the technical precision of installation information was critical for correct system commissioning.

Revit MEPAutoCAD MEPBIM Level 1

Technical Network

Proyecta BIM: specialized collaboration in Bajío.

For projects requiring technical presence in the Bajío region, SORA collaborates with Proyecta BIM — an independent firm with complementary specialization and the same technical standard. This collaboration extends geographic coverage capacity without compromising information quality standards.

Technical collaboration network

SORA | Technical BIM Integration

Mexico City

Proyecta BIM

Bajío Region

ISO 19650CDEBIM

Does your project require this level of technical integration?

We begin with a free technical assessment to understand the real scope of your project and define how we can support you.