BIM 4D
Construction scheduling linked to the BIM model. Construction simulation.
ISO 19650WBSPrimavera P6MS Project
BIM 4D integrates the time dimension into the 3D model to simulate the construction process, identify sequence conflicts and optimize construction planning.
Key benefits
- Visual simulation of the construction process
- Sequence conflict identification before construction
- Workforce and resource optimization
- Effective communication of the construction plan
Use cases
Industrial
Plant shutdown planning with minimal production impact.
Infrastructure
Construction sequences in projects with active traffic.
Data Centers
Phased construction with operational continuity.
Applied standards
ISO 19650WBSPrimavera P6MS Project