BIM 4D

Construction scheduling linked to the BIM model. Construction simulation.

BIM 4D

Construction scheduling linked to the BIM model. Construction simulation.

ISO 19650WBSPrimavera P6MS Project

BIM 4D integrates the time dimension into the 3D model to simulate the construction process, identify sequence conflicts and optimize construction planning.

Key benefits

  • Visual simulation of the construction process
  • Sequence conflict identification before construction
  • Workforce and resource optimization
  • Effective communication of the construction plan

Use cases

Industrial

Plant shutdown planning with minimal production impact.

Infrastructure

Construction sequences in projects with active traffic.

Data Centers

Phased construction with operational continuity.

Applied standards

ISO 19650WBSPrimavera P6MS Project