Strategic BIM Consulting
BIM maturity diagnosis, strategy and implementation aligned with ISO 19650 and The SORA Method.
BIM adoption without strategy produces compliance documentation, not information systems. SORA accompanies the transition from diagnosis to continuous operation: evaluating the current state, defining the level of information need using the LOIN approach, establishing the CDE, developing the BEP and training the team on processes that are actually used on site.
Key benefits
- BIM maturity diagnosis: evaluation of existing processes, tools, teams and information
- BIM implementation strategy aligned with ISO 19650 and client requirements
- LOIN definition by purpose — not by generic LOD levels
- BEP developed operationally, not as a compliance document
- CDE configuration and discipline-specific review flows
- Information QA/QC plan for the project
- Training oriented to real processes, not to software
- Technical accompaniment during implementation
Use cases
BIM implementation for promoters or contractors starting projects under ISO 19650 requirements from the end client.
Information management strategy for projects with multiple specialized contractors and traceability requirements.
Accompaniment in defining AIR and EIR for projects with information asset delivery requirements.